This project involved the replacement of a footbridge for a local council, with before and after results demonstrating the upgrade. Footbridges are available in a range of styles, including timber, concrete and metal, to suit different locations and budgets.

Before and after footbridge replacement
Durable Timber Construction
UC4 Treated Timber with Long-Term Guarantee
This particular bridge was constructed using UC4 treated timber, providing a durable solution designed for outdoor use and supported by a 15 year guarantee.
  • Footbridge replaced for local council
  • Constructed using UC4 treated timber
  • 15 year guarantee on timber
  • Suitable for a range of locations
  • Options available for different budgets and materials