Our team recently completed a full refurbishment of aged but structurally sound galvanised railings to bring them in line with newly installed green railing sections. The result? A seamless visual match and a longer lifespan for the existing installation - all achieved in just 4 days.
Cleaning and Priming for Performance
Preparing Aged Railings for a New Life
Although the galvanised railings were weathered, they remained in good working condition. We carried out a thorough clean and degrease, followed by a specialist etch primer and robust undercoat to ensure adhesion and protection before applying the final gloss topcoat.
- Full surface preparation and degreasing
- Etch priming to improve paint adhesion
- Undercoating and moss green gloss finish
- Colour matched to new railing installations
- Completed in 4 days with minimal disruption
Bringing Old and New Together
Unified Look with Long-Term Durability
Our careful refurbishing work allowed the older railings to blend seamlessly with newly installed ones, eliminating the need for full replacement. The moss green gloss finish adds not only visual cohesion but also a protective layer that ensures years of use to come.
- Improved longevity without full replacement
- Cost-effective and sustainable approach
- Consistent colour across all railing sections
- Professional-grade materials and finish